Adopting a dual rack and pinion drive mechanism for pipe
handling operations, it enables continuous and stable pipe
tripping, significantly improving the efficiency of pipe
string operations. Compared to hydraulic cylinder-type structures,
the rack and pinion design greatly reduces the overall length for
the same stroke, substantially lowering the overall height of the
snubbing unit. This optimizes equipment spatial layout, adapts to
various confined wellsite environments, and further enhances equipment
site adaptability and operational convenience.
--- Our Contact
Get In Touch With Us ?
Company address
Contact: Mr.
Han
Hancl@hisen-energy.com
08386083121/15283832586
No.26-1,Deyang Nanshan science and Technology
IsLand,Guanghan City,Deyang City,Sichuan,China