Composite Workover Rig — Dual-Core Integration, Mastering All
Workover Operations Dual-Core Integration, Two-in-One: We have
integrated the coiled tubing injector head and the snubbing unit
onto a single platform, retaining both the precise control of the
injector head over coiled tubing and the powerful tripping capability
of the snubbing unit for heavy-load pipe strings. With this single
piece of equipment, you can now cover the full spectrum of operations—from
lightweight coiled tubing interventions to heavyweight snubbing workovers.
Single Investment, Double Returns: The acquisition cost of one composite
workover rig is far less than purchasing a coiled tubing unit and a snubbing
unit separately. Invest in one piece of equipment and gain the operational
capabilities of two, multiplying your return on investment.
One Crew, Double Output: The same operating team, after minimal training,
can master both operation modes. There is no need to staff two different
crews for different equipment, significantly reducing labor costs.
One Mobilization, Double Coverage: With a single transport, one installation,
and one crane lift, you gain both coiled tubing and snubbing operational
capabilities. Mobilization costs are halved, while your operational scope is doubled.
Injector Head Parameters:
Maximum Continuous Lifting Force: 450 kN
Maximum Continuous Snubbing (Injection) Force: 225 kN
Maximum Lifting Speed (Small Discharge/High-Speed Gear): 50 m/min
Maximum Lifting Speed (Large Discharge/Low-Speed Gear): 25 m/min
--- Our Contact
Get In Touch With Us ?
Company address
Contact: Mr.
Han
Hancl@hisen-energy.com
08386083121/15283832586
No.26-1,Deyang Nanshan science and Technology
IsLand,Guanghan City,Deyang City,Sichuan,China